The direct answer

Before relying on a shell-and-core unit, test whether the premises can support the intended operation, not merely whether the floor area looks sufficient. Assemble the landlord information, inspect the actual condition, compare incoming and extract provisions with the business brief, check access and review obligations that may sit outside the tenant works. Turn every uncertainty into a named assumption, evidence request or professional investigation before it becomes a late fit-out variation.

Separate the lease decision from the fit-out concept

A strong concept cannot compensate for unsuitable access, inadequate service provisions or restrictions that conflict with the operating model. Keep three tracks visible: legal and commercial terms, technical property due diligence, and fit-out feasibility. Each requires the appropriate adviser. RICS describes technical due diligence as adaptable across commercial property types and stresses that its scope should be tailored to the brief and jurisdiction. Use that as a reason to define the investigation, not as a generic certificate that removes project risk.

Verify the base-build condition

Record what is physically present and what is only shown on a drawing. Confirm the unit boundary, floor and soffit condition, columns, shafts, façade interfaces, doors, meters, capped services and any equipment handed over. Photograph and schedule visible defects without opening or altering protected systems. Ask who owns each base-build element and who must rectify existing issues. A measured survey and specialist inspection may be needed; visual inspection alone cannot confirm concealed construction or capacity.

Translate the business into demands

Write the operating brief in practical terms: occupancy by period, heat-producing equipment, water use, extraction, refrigeration, privacy, acoustic sensitivity, deliveries, waste, security and technology. A café, clinic, salon and showroom can occupy similar areas but place very different demands on a unit. Do not assume a capped connection is adequate because it exists. The relevant professionals should compare the verified provisions with the equipment schedule and operating pattern, including peak conditions and future changes that matter to the tenant.

Read the landlord criteria as a design input

Request the current fit-out manual, drawing standards, submission stages, working-hour rules, logistics route, protection requirements and insurance or appointment documents relevant to the premises. Record which items need landlord review and which may need separate authority or specialist input for the actual use. Requirements vary by building and project; avoid copying an approval list from another tenancy. The important planning move is to identify reviewers, information dependencies and expected response windows before publishing an opening date.

Planning example

Consider a food unit that appears to have enough customer area. The initial plan fits the counter and seating, but the feasibility review shows that deliveries must cross the public route, the waste holding point is remote and the proposed kitchen equipment schedule has not been checked against available provisions. The team pauses the concept, tests a revised back-of-house arrangement and requests technical confirmation from the relevant parties. The example does not predict approval or programme; it shows why operational flow and verified capacity belong before lease reliance.

Build an evidence register

For each critical statement, record the source, revision and status. A landlord plan may show a connection, a site photograph may show a capped pipe, and a specialist report may confirm usable capacity; those are not equivalent forms of evidence. Mark documents as received, verified, pending clarification or superseded. Link every design assumption to the evidence it relies on. This simple discipline reduces the chance that an attractive concept quietly turns an unconfirmed note into a fact. It also gives legal, commercial and technical advisers a shared list without blending their separate responsibilities.

Test change before signing off feasibility

The first operating model may evolve, so test one realistic change: more seats, different equipment, a future treatment room, longer trading hours or a revised stock strategy. The purpose is not to future-proof everything; it is to identify provisions that would be disproportionately difficult to alter later. Note which changes remain possible within the proposed fit-out and which would require new landlord or authority review. A lease decision should be based on the intended use, with any flexibility described honestly rather than implied by an open shell.

Check access through the whole journey

Trace the path for construction materials, finished joinery, daily deliveries, waste and eventual maintenance. Measure doors, corridors and lift restrictions where access is permitted. Note loading arrangements, booking rules and protection expectations. Inside the unit, preserve practical routes to equipment and service points. A feature that fits on plan may still be impossible to deliver as one piece or remove for maintenance. These logistics affect package size, fabrication strategy and working sequence.

Pre-commitment checklist

Use one issue register shared by the commercial and technical teams.

  • Intended use and peak operating demands are written.
  • Unit boundaries and base-build condition are recorded.
  • Service availability and required capacities are professionally reviewed.
  • Landlord criteria and current submission route are obtained.
  • Delivery, waste, construction and maintenance access are tested.
  • Acoustic, privacy, extraction and specialist-use needs are identified.
  • Lease obligations and technical assumptions are separated.
  • Unknowns have owners, evidence requests and decision dates.

Limits and next step

A feasibility study cannot guarantee landlord or authority acceptance, discover every concealed defect or replace legal advice. Conditions may also change between inspection and possession. The next step is a written go, conditional-go or no-go review: list the evidence received, the unresolved risks, the proposed fit-out response and the assumptions that would affect cost or programme. Only then should the concept and opening plan be treated as a coordinated basis for further work.

Sources & further reading