Translate the operational brief into a coordinated interior and building-services scope. Establish what the landlord provides and what the tenant project must deliver.
Translate the operational brief into a coordinated interior and building-services scope. Establish what the landlord provides and what the tenant project must deliver. Your proposal identifies the agreed work packages, material choices and responsibilities for your specific property.
01
Shell-condition review
02
Space and service planning
03
Specialist coordination
04
Testing and handover
BEFORE DESIGN IS FINALISED
The right questions at the right time.
What is included in the base building?
Which services need upgrading?
Who provides equipment and design information?
We work through these decisions using the existing property information, site conditions and your priorities. Any specialist review or approval responsibility is identified in the project proposal.
BUDGET & PROGRAMME
Start with the scope.
A useful price follows measured quantities and an agreed specification. For shell and core fit out, the scope and installation interfaces matter as much as the visible finish.
The programme separates design, external reviews, procurement and site work. It also records the decisions needed from you before orders or installation can proceed.
A shell-and-core brief starts with the landlord information and an inspection of the actual unit. Identify available service capacities, connection points, access arrangements and the condition of the base build. The fit-out scope must distinguish landlord works, tenant works and specialist packages. Unverified assumptions should be recorded before a programme or fixed price is agreed.
Keep the agreed choices with the current drawings and specification. Identify who designs, supplies and installs each element, and how the work connects to neighbouring packages.
The proposal should also record any remaining investigations, product information and handover requirements. Resolve changes in writing so their effect on the scope and programme can be reviewed.
A tenant is comparing a bare unit with premises containing elements that may be retained. Document the actual condition and available landlord information before assuming either option needs less work. Map the business requirements against the shell and its systems with the appointed professionals. The useful comparison includes the whole path to an operational premises, not only the visible cost of partitions, ceilings and finishes.
A SCOPE YOU CAN REVIEW
What to resolve in the proposal
Identify landlord provisions, tenant additions and the information that requires verification. Request a coordinated design and work-package schedule with specialist responsibilities and relevant approvals clearly assigned. Keep investigations, allowances and exclusions explicit. Include the required testing, documentation and operator preparation interfaces so the transition from shell to use is understood by all parties.
Verify the base build before fixing scope or programme
Collect the landlord information, handover condition and venue rules, then compare them with an inspection of the actual unit. Record power, cooling, water, drainage, fire and communications information as available, together with access, loading and permitted working arrangements. Where capacity or condition is not verified, keep it as an explicit investigation rather than converting it into a silent pricing assumption.
Create a responsibility matrix separating landlord work, tenant work, specialist supply and operator-provided equipment. Include connections, builders' work, controls, testing and making good at each boundary. This prevents a line such as 'by others' from leaving the same interface absent from every proposal. The matrix should be reviewed whenever the operational brief or equipment schedule changes.
Compare premises by the route to operational readiness
A bare unit may offer design freedom but require more infrastructure; a partly fitted unit may contain usable elements alongside unknown alterations or removal work. Compare both against the same business requirements, retained-item assessment, approval path and opening dependencies. The visible finish cost alone does not show which premises offers the clearer or more controllable route to use.
Before commitment, establish the surveys, design appointments, submissions and landlord reviews needed for the proposed use. The developed programme should include long-lead selections, specialist coordination, inspections, commissioning, documentation and operator activities such as equipment installation or staff preparation. State dependencies and decision dates so an ambitious opening target is not mistaken for a verified completion promise.
CONNECTED SCOPE
Plan the neighbouring decisions.
These related services often meet this scope at shared drawings, finishes, services or handover points.